Project Details
Address: 7888 200 Street, Langley, BC
Project Information: 92,000 Sq.ft of Sports Complex- LEED standard
Completion date: 2013
Project Type: New Construction, Design Build
Architect: CTA Design Group
Mechanical Consultant: BC Comfort
General Contractor: Wales Mclelland Construction
Mechanical System Description: High efficiency gas/electric RTUs, Heat recovery ventilation, CO2 demand ventilation control, In-floor heating with high efficiency condensing boilers. BACnet building automation system with remote access.
Roles and Responsibilities: Assisting client to provide the most energy efficient and cost effective HVAC system suitable for this application. Design, engineering, supply and installation of a fully operational mechanical system. BACnet based building automation system. Complete plumbing distribution for the entire facility.