Warner Brother Crestwood

Project Details Address: 13480 Crestwood Place, Richmond Completion date: December 2020 Project Type: 100,000Ft2,  Exhaust and Supply fan system, Gas Detection with DDC Mechanical System Description: 10 exhaust fans 10,000CFM each with Fabrihoods Roles & Responsibilities: HVAC only, Supply and install rooftop exhaust system for stages Other ProjectsOffice BuildingsFluor CanadaadminWarehouse / Office BuildingsPivotal NorthstillwaterWarehouse / Office BuildingsFood4Change HVAC UpgradestillwaterOffice BuildingsTransCold… Continue Reading Warner Brother Crestwood

Parallel 49 Glycol Piping

Project Details Address: 1950 Triumph Street, Vancouver Completion date: Spring 2021 Project Type: Retrofit Pipefitting Services and New Plumbing Installation Mechanical System Description: Glycol Piping System for Process Stacks. Dedicated Hot Water and Recirculation System to provide Critical Temperature Control of Food-Grade Product Roles & Responsibilities: Retrofit existing Glycol Supply and Return piping Systems to incorporate into new Equipment infrastructure.… Continue Reading Parallel 49 Glycol Piping

Westshore Coal Terminal PPU Installation and Rooftop Unit Replacement

Project Details Address: 1 Roberts Bank Road, Delta Completion date: Winter 2020 Project Type: New PPU Installation and Rooftop HVAC Unit Retrofit Mechanical System Description: Positive Pressurization Units (PPUs) for 2 x Electrical Substations and 1 x 25 Ton Rooftop HVAC Unit Replacement for Electrical Substation Roles & Responsibilities: Supply, layout and Installation of equipment, Demo of existing equipment, Start-up… Continue Reading Westshore Coal Terminal PPU Installation and Rooftop Unit Replacement

Bridge Studios Hand Wash Sinks

Project Details Address: 2400 Boundary Road, Burnaby Completion date: Fall 2020 Project Type: Plumbing Retrofit Mechanical System Description: Installation of 12 x Hand Washing Stations with Automatic Sensor Faucets at Stage Entrances Roles & Responsibilities: Purpose of Installation was to provide additional Safety Measures in response to Covid19 Other ProjectsOffice BuildingsFluor CanadastillwaterWarehouse / Office BuildingsPivotal NorthstillwaterWarehouse / Office BuildingsFood4Change HVAC… Continue Reading Bridge Studios Hand Wash Sinks

8585 Baxter Place Replacement Rooftop HVAC Units

Project Details Address: 8585 Baxter Place, Burnaby Completion date: Summer 2020 Project Type: Retrofit Replacement Rooftop HVAC Equipment Mechanical System Description: 10 x Packaged Gas/Electric Rooftop HVAC Units Roles & Responsibilities: Hoist and replace 10 x Rooftop HVAC Units over 1 Business Day with Equipment Start-Up and Commissioning completed following Business Day Other ProjectsOffice BuildingsFluor CanadastillwaterWarehouse / Office BuildingsPivotal NorthstillwaterWarehouse… Continue Reading 8585 Baxter Place Replacement Rooftop HVAC Units

Amazon DVC1

Project Details Address: 4242 Phillips Avenue, Burnaby Completion date: June 2020 Project Type: Renovation Tenant Improvement Mechanical Consultant: Dialectric Engineering General Contractor: Oliver Builders Mechanical System Description: Plumbing and HVAC Upgrades to Employee Washrooms and Lunch Room and new Plumbing and HVAC Installation for Locker Rooms and Break Rooms General Contractor: Coordination with General Contractor and Amazon to ensure Mechanical… Continue Reading Amazon DVC1

Avcorp F-35B HVAC Upgrade

Project Details Address: 10025 River Way, Delta Completion date: Summer 2020 Project Type: Design-Build HVAC Upgrade Mechanical Consultant: BC Comfort Mechanical System Description: New HVAC and Exhaust Systems to serve 8,500 sq.ft. space.  HVAC consisting of 18,200 CFM Packaged MUA with 28.5 Tons of Cooling and 3 x 5,000 CFM Exhaust Fans.  Full DDC System installation with Graphics and emailed… Continue Reading Avcorp F-35B HVAC Upgrade

Natural Factors MUA-1 Replacement

Project Details Address: 1550 United Boulevard, Coquitlam Completion date: December 2020 Project Type: Retrofit Make-Up-Air Unit Replacement Roles & Responsibilities: Roof-Mounted Make-Up-Air Unit Replacement over planned Plant Shut-Down over holiday period Mechanical System Description: 25,000 CFM MUA with 75 Tons of Cooling – Serving 3 Floors of Production Space Other ProjectsOffice BuildingsFluor CanadastillwaterWarehouse / Office BuildingsPivotal NorthstillwaterWarehouse / Office BuildingsFood4Change… Continue Reading Natural Factors MUA-1 Replacement

Group Health

Project DetailsAddress: 15315 – 31st Ave, Surrey, BC Project Information: 40,000 Sq. ft of office space Completion date: July 2020 Project Type: New Construction Architect: Dialog Mechanical Consultant: BC Comfort General Contractor: Wales Mclelland Construction Mechanical System Description: VAV system, fancoil and rooftop condensors, energy ventilator to supply the building with fresh air Roles and Responsibilities: Complete design of mechanical… Continue Reading Group Health

GWL

Project DetailsAddress: 4327 Salish Seaway, Tsawwassen, BC Project Information: 450,000 Sq. ft warehouse Completion date: March 2020 Project Type: New Construction Architect: CTA Mechanical Consultant: BC Comfort General Contractor: Wales Mclelland Construction Mechanical System Description: Stand alone gas fired unit heaters, destratification fans and plumbing system for drainage Roles and Responsibilities: Design plumbing system to facilitate proper drainage, rain water… Continue Reading GWL