Project Details Address: 1200 Lonsdale Ave, North Vancouver, BC Project Information: Installation of a Direct Digital Control (DDC) system. Completion date: 2019 Project Type: Automation Systems Upgrade Mechanical Consultant: BC Comfort Previous System Description: 1200 Lonsdale Ave was running on heat pumps loops that were controlled by and existing Exeter control panel. There was an additional Honeywell controller to control… Continue Reading 1200 Lonsdale
Trailer Wizards
Project Details Address: 10387 Nordel Court, Delta, BC Project Information: 44,000 SF Truck Repair Facility and Offices. Completion date: July 2015 Project Type: Design Build Mechanical Consultant: BC Comfort General Contractor: Load Path Construction Mechanical System Description: Infrared heaters in repair shop and roof top units/Split Systems for office areas. Other ProjectsOffice BuildingsFluor CanadastillwaterWarehouse / Office BuildingsPivotal NorthstillwaterWarehouse / Office… Continue Reading Trailer Wizards
Boundary Bay Industrial Park Phase 2
Project Details Address: 8181 Churchill St. Delta, BC Project Information: 450,000 SF Distribution Facility for TJX (Parent Company of Marshalls, Winners, Homesense) Completion date: April 2016 Project Type: Design Build Mechanical Consultant: BC Comfort General Contractor: Wales Mclelland Construction Mechanical System Description: Gas fired unit heaters in warehouse and roof top units for office areas. Other ProjectsOffice BuildingsFluor CanadastillwaterWarehouse /… Continue Reading Boundary Bay Industrial Park Phase 2
BFI Service Garage
Project Details Address: Coquitlam, BC Project Information: 13,000 Sq. Ft., Design-build of a new service garage for BFI line of waste management vehicles. As these vehicles operate on Compressed Natural Gas (CNG), special safety measures in the HVAC design needed to be implemented as well as a special truck washing station. Completion date: June 2014 Project Type: New Construction, Design… Continue Reading BFI Service Garage
Global Relay
Project Details Address: 22 Gostick Place, North Vancouver, BC Project Information: 17,000 Sq.ft High End Data Centre Facility Completion date: Summer 2013 Project Type: New Construction, Design Build Architect: Chris Bozyk Architecture Mechanical Engineers: BC Comfort General Contractor: Wales Mclelland Construction Mechanical System Description: Variable refrigeration flow system combined with evaporative cooling system, Built-in free cooling capabilities, with variable air… Continue Reading Global Relay
Langley Event Centre Building B
Project Details Address: 7888 200 Street, Langley, BC Project Information: 92,000 Sq.ft of Sports Complex- LEED standard Completion date: 2013 Project Type: New Construction, Design Build Architect: CTA Design Group Mechanical Consultant: BC Comfort General Contractor: Wales Mclelland Construction Mechanical System Description: High efficiency gas/electric RTUs, Heat recovery ventilation, CO2 demand ventilation control, In-floor heating with high efficiency condensing boilers.… Continue Reading Langley Event Centre Building B
Griffin Self-Storage
Project Details Address: 901 West 3rd St., North Vancouver, BC Project Information: 40,000 SF 2-storey Self-Storage Facility including 2500 SF of temperature controlled wine storage. Completion date: March 2017 Project Type: Design Build Mechanical Consultant: BC Comfort General Contractor: Prism Construction Mechanical System Description: Roof Top Units for Self-Storage areas. Full humidity and temperature control refrigeration units for wine storage… Continue Reading Griffin Self-Storage
Queensborough Self Storage
Project Details Address: 800 Boyd Street, New Westminster, BC Project Information: 60,000 Sq.ft Self Storage Facility Completion date: November 2011 Project Type: New Construction, Design Build Mechanical Consultant: BC Comfort General Contractor: Prism Construction Mechanical System Description: Heating and ventilation system, gas fired forced air system. Roles and Responsibilities: Assisted client to provide the most energy efficient and cost effective… Continue Reading Queensborough Self Storage
Central City U-Lock
Project Details Address: 10356 138A Street, Surrey, BC Project Information: Self Storage Facility Completion date: June 2007 Project Type: New Construction, Design Build Architect: Forcier Design and Consulting Mechanical Consultant: BC Comfort General Contractor: Prism Construction Mechanical System Description: Heating and ventilation system, gas fired forced air system. Roles and Responsibilities: Assisted client to provide the most energy efficient and… Continue Reading Central City U-Lock
Mayfair Storage
Project Details Address: 1385 Crown Street, North Vancouver, BC Project Information: 80,000 of 4-storey Self Storage Facility Completion date: February 2007 Project Type: New Construction, Design Build Architect: Relative Form Architecture Studio Mechanical Consultant: BC Comfort General Contractor: Prism Construction Mechanical System Description: Heating and ventilation system, gas fired forced air system. Roles and Responsibilities: Assisting client to provide the… Continue Reading Mayfair Storage